Timeline Date 1998


Greening campus was the focus

May 12.  University Hall Plaza, the east entrance to the Chicago Circle Center (Student Center East), and areas around the Art and Architecture building (Art and Design Studios), Science and Engineering South, and the Science and Engineering Offices received a $5.8 million facelift.

[064-00-09 Office of Public Affairs — UIC News 1998.MAR.25] back to Timelines

Copyright © 2016 The Board of Trustees of the University of Illinois